Darkroom No. 7 – hitting the finish line!

15th of June 2017, 29 degrees celcius. Seemed like the perfect day to finish the build of the darkroom 😊

Going through all the still unopend boxes to make sure I had all the ones with “doka ’17” written on them was quite a bit of work. But hard work always pays off and everything has been installed now except for the glass plates. Good to go!

Took quite a bit more time than anticipated but very happy now!


Cheers! 🍻

Advertisements

Building Darkroom No. 7

Yep, it’s that time again 😊

Trying to rebuild my darkroom again. Not going as good and fast as I hoped but it’s slowly getting there… 😊 Moving can be quite demotivating but I know why I’m doing it..


New Atelier is Coming Together!

Hi all, it’s been awhile but it’s been soooooooooooooo busy! I rode a spinning marathon the day before our Big Move, it was great! The Big Move was too 🙂 Busy at work, like insanely, plus projects with deadlines, some (minor) health issues though not very pleasant, and some more stuff going on have made these past few weeks quite something. In between the darkroom and studio are coming together nicely.

We hung the background paper yesterday, all it really needs is lights set up, the table top set up and I’m good to go there! During the day it looks like this (taken from the “office” part where I have my scanner, printer etc. set up):

Nr4186_LR

This is what it looks like when looking from the doors towards the inside of the space:

Nr4188_LR

And here’s with the background paper (2,75 seems so small now haha) hanging and me being happy 🙂

Nr4309_studio

When you look in the back of the second photo you can see the stairs going up all the way on the left and on the right is an opening. This leads to a short kind off hallway which leads to two cellars. One is my darkroom. On the hallway is a bit more storage space for our things.

The working table has been fixed, big trays stacked underneath it as is the large container with sodium thio-sulphate and a bin. The wet table still has to be connected, waiting for a hot water boiler to arrive. When that’s done I can fill up the storage space beneath them.

Nr4313_doka

Shelves have been hung (quite the challenge with these marl walls!) but it’s there! Chemistry has been unpacked, everything is a bit in place now. Darkroom safelights still have to be mounted, certain chemistry fixed etc. and I can roll again! During actual working in this space things will probably get moved around a little to improve working but it’s pretty nice already I guess 🙂 Have to find a place for my large papers but that will fit in once the time is there. Also, the big white board needs to be mounted to the wall…I hope it will hold…trick so far: no plugs, just screw directly into the wall.

Nr4317_doka2

Anyway, looking forward finishing this! I have a proper shoot planned at the end of this month. Need some new collodion first (which is on its way but will not arrive before March 23nd) and need to desperately fix my silver bath. Already have a large erlenmeyer and cooking plate to do that. This week it’ll have to happen as well as the first collodion test as I have been invited by Gulpener Bier brewery to photograph their brewery on collodion for their “PUUR” magazine with a (short) interview of me. Will have to be shot this Sunday / Monday but so cool I’ll have to make my stuff work before then. Only will have to shoot small plates as I’m practically out of collodion oehh…. 🙂

❤💕❤


Atelier Contrastique is Moving!

I almost can’t believe it but my boyfriend and I will be moving into another house in the beginning of next year. Thus so will Contrastique. Besides that we’re going to have a fabulous kitchen (we love to cook and eat), a really nice garden with actual grass haha the house also has a truly magnificent basement. I didn’t think it was possible to find a house with an even nicer basement but we sure did! As is the case now my darkroom and studio will be made there. So…right now we’re cleaning things out and packing up the entire thing. Now I really realise just how much stuff I have gathered over the last couple of years, especially since I started woking with alternative processes haha…emptying the shelves and packing is A LOT of work 🙂

DR

The basement is actually split in two parts: one separate part which forms the original basement and is already light-tight on its own will be housing my new darkroom. The ceiling is a little lower than I have now (2 metres instead of 2.20) but plenty of space to work, keep my chemistry (fridge), DR-papers and no more risk of flooding as it’s higher than the rest! As soon as the build and decorating starts I’ll post images of its progress. I am soooo looking forward to that!

darkroomentrance

When you stand with your back towards the entrance of the darkroom you look into the studio space. This is an ancient marl basement dating from the original farmer’s house that once was there from around the 1800’s. Our new house has been build on top of it when the farm was demolished. The former owner restored that basement, made it a 50 cm’s higher and placed a large window with doors in it (daylight studio aaaaahhhh though not towards the North, but hey; I’ll  happily deal with that 🙂 ). This is much higher and wider than our current basement and great for a studio. I already have the first assignment planned for 2014, a couple on collodion, so this will be fantastic! I also got asked to make images from racing/mtb bikes for a magazine à la my collodion-alternative-style, something I was already working on for my own, so this is great! I now have the space to get really creative with light and composition.

studio

The basement also contains a toilet (very convenient), a small kitchen with a sink and a fridge so it’s more than perfect. I will also be using it as a office so I don’t have to do my administrative chores at the dining table, which was comfortable and cosy but also made it a mess with papers, cables and the like. This does mean that Contrastique will be closed for about two months before I have everything up and running again. But as my Silver Nitrate bath is shot anyway and due for extensive maintenance I can’t shoot any collodion plates now anyway.

I’m also in the process of planning a date for a dry plate collodion workshop by Jeroen de Wijs. It will be a three day course which covers all the aspects of dry plate negatives and salt printing. This is supposed to take place around March.

So….2014 is already full of beautiful, fun and exciting challenges and I am looking forward to it immensely! I wish you all the same kind of happiness and fortune for 2014!